
Walvis Bay · NamibiaStudy completed · Study completed, ready for capital structuring
Feasibility study: tin smelter with Ta and Nb recovery
The requestAssessing the technical and logistical conditions to implement a tin smelting plant with an integrated module for tantalum (Ta) and niobium (Nb) recovery.
The metallurgyTechnical feasibility and engineering route study for implementation in Walvis Bay or surrounding areas, leveraging the strategic port position connected to mineral concentrate flows from Southern Africa (Zambia, Botswana and DRC).
The deliveryFeasibility study completed and ready for capital structuring.
Related service
Technical and economic feasibility study · CAPEX and OPEX
