Titan Engenharia
banner-projeto.jpg
VenezuelaExecutive design delivered

High-purity tin smelter

99.9%

purity projected in the technology route

The requestGreenfield project: nothing built. The investment decision depended on a defensible executive design, not an estimate.
The metallurgyComplete preparation of the executive design for high-purity tin production: flowsheet, mass balance, layout, equipment sizing, utilities, CAPEX and OPEX.
The deliveryExecutive design delivered with the technology route closed for 99.9% purity, ready for assembly, with CAPEX and OPEX opened line by line.
Marlon de Mendonça

Marlon de Mendonça

The founder

marlon@engenhariatitan.com.br

Talk about a similar project