Democratic Republic of Congo2021 · In operation
MMR — Mining Mineral Resources
99.95%
purity of the tin delivered
300t/month
refined tin produced since 2023
The requestA mining company with smelting equipment already purchased and never installed, sitting idle on site. Capital tied up, no production and no defined route for the metal.
The metallurgyComplete assembly of the tin smelter reusing the existing equipment; assembly of the solder alloy production plant; design of a tantalum and niobium recovery route from the slag generated by the tin process.
The deliveryProduction of high-purity tin (99.95%) and a solder alloy line running. Ta/Nb slag recovery route designed — new revenue from material that used to go to the waste pile.