Lubumbashi · Democratic Republic of CongoTarget for 2028 · In execution
Doubling the refining capacity
600t/month
target refined tin output in 2028 — double the current capacity
The requestBringing the tin processing and refining plant to the next level of production scale.
The metallurgyFull redesign of the plant layout to enable the doubling of production during 2027.
The deliveryLayout redesign in execution, targeting a fully-capable manufacturing unit by 2028 — double the current installed capacity.
Related service
Complete executive design, start-up and commissioningOther projects from the same account